This project is substantially complete. 

As part of the Ada County Highway District’s (ACHD) Bridge Maintenance Program, ACHD will replace the culvert on 26th Street, just south of Hill Road, as early as the beginning of October 2023.* Construction is expected to be complete spring of 2024.

This bridge improvement project will include removing and replacing the existing bridge over the Boise City Canal. In addition to this work, the contractor will be filling in a sidewalk gap on the west side of 26th Street.

*Construction schedules may change due to high demand for contractors, labor, and supplies.

As part of the Ada County Highway District’s (ACHD) Bridge Maintenance Program, ACHD will replace the culvert on 26th Street, just south of Hill Road, as early as the beginning of October 2023.* Construction is expected to be complete spring of 2024.

This bridge improvement project will include removing and replacing the existing bridge over the Boise City Canal. In addition to this work, the contractor will be filling in a sidewalk gap on the west side of 26th Street.

*Construction schedules may change due to high demand for contractors, labor, and supplies.

This project is substantially complete. 

  • October 27, 2023

    Share October 27, 2023 on Facebook Share October 27, 2023 on Twitter Share October 27, 2023 on Linkedin Email October 27, 2023 link
    • Intermountain Gas relocating utility on the 26th.
  • October 12, 2023

    Share October 12, 2023 on Facebook Share October 12, 2023 on Twitter Share October 12, 2023 on Linkedin Email October 12, 2023 link
    • Shop drawings approved.
    • IG relocating utility on 26th.
  • September 8th, 2023

    Share September 8th, 2023 on Facebook Share September 8th, 2023 on Twitter Share September 8th, 2023 on Linkedin Email September 8th, 2023 link

    Preconstruction Conference was August 29th. Notice to proceed is October 16th. Contractor anticipating starting at 26th St.

  • August 24, 2023

    Share August 24, 2023 on Facebook Share August 24, 2023 on Twitter Share August 24, 2023 on Linkedin Email August 24, 2023 link

    Construction Impacts

    • Temporary road closures
    • Lane restrictions with flaggers
    • General construction noise, dust, equipment backup alarms and ground vibration
    • Crews will work from 7 a.m. to 7 p.m. unless otherwise approved
    • The contractor will work with property owners to minimize construction impacts