  • Brandon Road and Floating Feather are both closed.
  • Installing City of Star's sewer - ongoing.
  • Foothill Ditch - complete.
  • Lateral 12 - concrete forms in place both sides. Box pieces set.
  • Headwall placement by March 15th.
  • Floating Feather - Box pieces ongoing. Headwalls ongoing. Placing waterproof membrane.