December 8, 2023

08 Dec 2023
  • Roadway is closed for the duration of the work.
  • Contractor removing culvert.
  • Precast components being constructed.
  • Granite Excavation relocating water line.
Share December 8, 2023 on Facebook Share December 8, 2023 on Twitter Share December 8, 2023 on Linkedin Email December 8, 2023 link
#<Object:0x00007fcfbc3c9bf8>