March 29, 2024

  • Roadway is closed for the duration of the work.
  • Concrete sidewalk and curb complete.
  • Concrete paving ongoing.
Share March 29, 2024 on Facebook Share March 29, 2024 on Twitter Share March 29, 2024 on Linkedin Email March 29, 2024 link
<span class="translation_missing" title="translation missing: en-US.projects.blog_posts.show.load_comment_text">Load Comment Text</span>