Collister Drive Maintenance and Pedestrian Project, Quail Ridge Dr. to the cul-de-sac to the north

Share Collister Drive Maintenance and Pedestrian Project, Quail Ridge Dr. to the cul-de-sac to the north on Facebook Share Collister Drive Maintenance and Pedestrian Project, Quail Ridge Dr. to the cul-de-sac to the north on Twitter Share Collister Drive Maintenance and Pedestrian Project, Quail Ridge Dr. to the cul-de-sac to the north on Linkedin Email Collister Drive Maintenance and Pedestrian Project, Quail Ridge Dr. to the cul-de-sac to the north link

Project Description

  • Remove existing, deteriorating concrete roadway and replace with asphalt.
  • Add speed humps.
  • Replace the existing curb, gutter and four-foot sidewalk on the east side of the street with rolled curb and a five-foot sidewalk, matching the existing back of sidewalk.
  • The intent is to have minimal impacts to private property; therefore, the new sidewalk will match the back of the existing sidewalk. However, temporary easements will still be needed during construction to facilitate sod repairs and sprinkler work.
  • Temporary easements will allow for a working area and access as required for any driveway repairs, sprinkler/sod repairs, or other minor repair work that may be required on private properties for the installation of the new sidewalk.

Project Purpose

  • Improve roadway surface
  • Update pedestrian facilities to modern standards

Project Considerations

  • Safety for pedestrians, bicyclists and motorists
  • Property impacts
  • Pavement condition
  • Accessible sidewalks and pedestrian ramps

Project Description

  • Remove existing, deteriorating concrete roadway and replace with asphalt.
  • Add speed humps.
  • Replace the existing curb, gutter and four-foot sidewalk on the east side of the street with rolled curb and a five-foot sidewalk, matching the existing back of sidewalk.
  • The intent is to have minimal impacts to private property; therefore, the new sidewalk will match the back of the existing sidewalk. However, temporary easements will still be needed during construction to facilitate sod repairs and sprinkler work.
  • Temporary easements will allow for a working area and access as required for any driveway repairs, sprinkler/sod repairs, or other minor repair work that may be required on private properties for the installation of the new sidewalk.

Project Purpose

  • Improve roadway surface
  • Update pedestrian facilities to modern standards

Project Considerations

  • Safety for pedestrians, bicyclists and motorists
  • Property impacts
  • Pavement condition
  • Accessible sidewalks and pedestrian ramps
  • Construction to start mid-July 2023

    Share Construction to start mid-July 2023 on Facebook Share Construction to start mid-July 2023 on Twitter Share Construction to start mid-July 2023 on Linkedin Email Construction to start mid-July 2023 link

    The Ada County Highway District (ACHD) will begin construction on Collister Drive, Quail Ridge Dr. to the cul-de-sac as early as mid-July 2023.* Construction is expected to be complete October 2023.

    Construction Impacts

    • One lane will remain open at all times.
    • Lane restrictions wtih flaggers.
    • Temporary pedestrian detours.
    • General construction noise, dust, equipment backup alarms and ground vibration.
    • On-street parking will not be permitted in the work area during construction.
    • Regular construction hours are planned between 7:00am and 6:00pm Monday through Friday. Daily single lane closures may occur between 8:30am and 4:30pm. Evening work from 6:00pm to 10:00pm may occur periodically during the construction duration, with prior approval.


    The contractor will work with property owners to minimize property impacts.


    * Due to high demand for contractors, labor and supplies, construction schedules may change.

    The Ada County Highway District (ACHD) will begin construction on Collister Drive, Quail Ridge Dr. to the cul-de-sac as early as mid-July 2023.* Construction is expected to be complete October 2023.

    Construction Impacts

    • One lane will remain open at all times.
    • Lane restrictions wtih flaggers.
    • Temporary pedestrian detours.
    • General construction noise, dust, equipment backup alarms and ground vibration.
    • On-street parking will not be permitted in the work area during construction.
    • Regular construction hours are planned between 7:00am and 6:00pm Monday through Friday. Daily single lane closures may occur between 8:30am and 4:30pm. Evening work from 6:00pm to 10:00pm may occur periodically during the construction duration, with prior approval.


    The contractor will work with property owners to minimize property impacts.


    * Due to high demand for contractors, labor and supplies, construction schedules may change.