October 28, 2024
Construct a 10-ft multi-use concrete pathway on the east side of Horseshoe Bend Rd from State St to Hill Rd. Includes a PHB at Horseshoe Bend Rd and Utahna Rd, precast pedestrian bridge over the irrigation canal, a drainage basin, vertical curb, crosswalk, block retaining wall, and bikeway signage.
Project to start 2027