• Skip to main content
  • Jump to navigation
  • Search

IE10 and below are not supported.

Google Chrome Mozilla Firefox

Contact us for any help on browser support

Picture of roadway with cars, bike lanes and pedestrian walking on sidewalks. Logo for IFYWP in center of photo.

You are here:

  • Home
  • Integrated Five-Year Work Plan (IFYWP) 2024-2028

Integrated Five-Year Work Plan by Planning Area

  • document icon Barber Valley.pdf (158 KB) (pdf)
  • document icon Boise Central Bench.pdf (370 KB) (pdf)
  • document icon Boise Downtown.pdf (240 KB) (pdf)
  • document icon Boise East End.pdf (254 KB) (pdf)
  • document icon Boise North.pdf (370 KB) (pdf)
  • document icon Boise Northwest.pdf (301 KB) (pdf)
  • document icon Boise Southeast.pdf (282 KB) (pdf)
  • document icon Boise Southwest.pdf (490 KB) (pdf)
  • document icon Boise West Bench.pdf (359 KB) (pdf)
  • document icon Eagle.pdf (340 KB) (pdf)
  • document icon Garden City.pdf (329 KB) (pdf)
  • document icon Kuna.pdf (333 KB) (pdf)
  • document icon Meridian Downtown.pdf (271 KB) (pdf)
  • document icon Meridian North.pdf (477 KB) (pdf)
  • document icon Meridian South.pdf (451 KB) (pdf)
  • document icon Star.pdf (230 KB) (pdf)
  • document icon Miscellaneous.pdf (435 KB) (pdf)