January 6, 2023

  • Sidewalk being placed between Overland and Pond ongoing.
  • New signal poles installed at Roosevelt and Kootenai is complete.
  • Waiting on pedestrian ramps at Roosevelt.
  • Owyhee storm drain ongoing.
Share on Facebook Share on Twitter Share on Linkedin Email this link

This project is substantially complete. 