  • Sidewalk being placed between Overland and Pond ongoing.
  • New signal poles installed at Roosevelt and Kootenai is complete.
  • Waiting on pedestrian ramps at Roosevelt.
  • Owyhee storm drain ongoing.
Share January 6, 2023 on Facebook Share January 6, 2023 on Twitter Share January 6, 2023 on Linkedin Email January 6, 2023 link