The Ada County Highway District (ACHD) is developing a concept design for Locust Grove Road from Fairview Avenue to Ustick Road. The study will look at ways to improve traffic flow, accessibility, and safety while minimizing impacts to nearby homes and businesses.
The Ada County Highway District (ACHD) is developing a concept design for Locust Grove Road from Fairview Avenue to Ustick Road. The study will look at ways to improve traffic flow, accessibility, and safety while minimizing impacts to nearby homes and businesses.
-
View the final concept!
Share View the final concept! on Facebook Share View the final concept! on X (formerly Twitter) Share View the final concept! on Linkedin Email View the final concept! linkThe Locust Grove Road Concept has been finalized, with Alternative B selected as the final concept. Alternative B includes four travel lanes, a center turn lane for most of the corridor, 10-foot multi-use pathways on both sides of Locust Grove Road, and improved pedestrian crossings.
View the final concept below!
What’s Next?
As the project moves into design, several key elements and additional considerations will be further evaluated and refined:
- Access and Turn Lanes: Access to neighborhoods, businesses, and side streets will be reviewed, along with the length of turn lanes.
- Landscaping and Property Impacts: ACHD will work with the City of Meridian to look at landscaping opportunities within the buffer, where possible. Landscaping will depend on utility and drainage needs. The project team will also look for ways to reduce impacts to nearby properties.
- Locust Grove Road and Fairview Avenue Intersection: The design will tie into the planned intersection improvements and will provide a smooth transition between the two projects.
During design, additional analyses will help address specific issues and guide final adjustments to the plans.
The Locust Grove Road Concept has been finalized, with Alternative B selected as the final concept. Alternative B includes four travel lanes, a center turn lane for most of the corridor, 10-foot multi-use pathways on both sides of Locust Grove Road, and improved pedestrian crossings.
View the final concept below!
What’s Next?
As the project moves into design, several key elements and additional considerations will be further evaluated and refined:
- Access and Turn Lanes: Access to neighborhoods, businesses, and side streets will be reviewed, along with the length of turn lanes.
- Landscaping and Property Impacts: ACHD will work with the City of Meridian to look at landscaping opportunities within the buffer, where possible. Landscaping will depend on utility and drainage needs. The project team will also look for ways to reduce impacts to nearby properties.
- Locust Grove Road and Fairview Avenue Intersection: The design will tie into the planned intersection improvements and will provide a smooth transition between the two projects.
During design, additional analyses will help address specific issues and guide final adjustments to the plans.
-
What We Heard
Share What We Heard on Facebook Share What We Heard on X (formerly Twitter) Share What We Heard on Linkedin Email What We Heard linkThank you to everyone who participated in the February public involvement for the Locust Grove Road project between Fairview Avenue and Ustick Road.
View the February 2026 Public Involvement Summary
What’s Next
ACHD is reviewing public feedback along with technical analysis to identify a preferred alternative. Updates will be shared as the project progresses.
Thank you to everyone who participated in the February public involvement for the Locust Grove Road project between Fairview Avenue and Ustick Road.
View the February 2026 Public Involvement Summary
What’s Next
ACHD is reviewing public feedback along with technical analysis to identify a preferred alternative. Updates will be shared as the project progresses.
-
February 2026 Public Outreach & Alternatives
Share February 2026 Public Outreach & Alternatives on Facebook Share February 2026 Public Outreach & Alternatives on X (formerly Twitter) Share February 2026 Public Outreach & Alternatives on Linkedin Email February 2026 Public Outreach & Alternatives linkBased on public input from the Fall 2025 community survey, ACHD developed two concepts for Locust Grove Road between Fairview Avenue and Ustick Road for you to review. Your input is important and will help guide our decision on which alternative to move forward with.
Please review the information below and let us know what you think of the two alternatives. While comments are always welcome, the survey closed March 12, 2025.
Open House
ACHD is hosting a public open house on March 4, 2026 from 6:30 - 8:00 p.m., at Chief Joseph Elementary School at 1100 E Chateau Drive in Meridian to share the proposed alternatives. The meeting format will be a self-guided open house with display boards, roll plots, and comment sheets.
Based on public input from the Fall 2025 community survey, ACHD developed two concepts for Locust Grove Road between Fairview Avenue and Ustick Road for you to review. Your input is important and will help guide our decision on which alternative to move forward with.
Please review the information below and let us know what you think of the two alternatives. While comments are always welcome, the survey closed March 12, 2025.
Open House
ACHD is hosting a public open house on March 4, 2026 from 6:30 - 8:00 p.m., at Chief Joseph Elementary School at 1100 E Chateau Drive in Meridian to share the proposed alternatives. The meeting format will be a self-guided open house with display boards, roll plots, and comment sheets.
-
Fall 2025 Public Outreach
Share Fall 2025 Public Outreach on Facebook Share Fall 2025 Public Outreach on X (formerly Twitter) Share Fall 2025 Public Outreach on Linkedin Email Fall 2025 Public Outreach linkView the fall 2025 public outreach infographic comment summary below.
View the fall 2025 public outreach infographic comment summary below.
-
March 04 2026
-
September 2025
Locust Grove Road, Fairview Avenue to Ustick Road has finished this stagePublic Input Opportunity #1
-
Winter 2025
Locust Grove Road, Fairview Avenue to Ustick Road has finished this stageInitial Concept Design
-
Spring 2026
Locust Grove Road, Fairview Avenue to Ustick Road has finished this stagePublic Input Opportunity #2
-
Spring - Summer 2026
Locust Grove Road, Fairview Avenue to Ustick Road is currently at this stageRefined Concept Design
-
Fall 2026
this is an upcoming stage for Locust Grove Road, Fairview Avenue to Ustick RoadFinal Concept Report for Commission Adoption
-
Community and Business Relations Coordinator
Phone 208-387-6100 Email connect@achdidaho.org -
Supervisor, Planning & Programming
Phone 208-387-6100 Email connect@achdidaho.org