Interim Signal Installation
An interim signal has been installed at Black Cat and McMillan to assist with alleviating increased congestion in the area as a result from the Ustick Road widening project and the Idaho 16 construction. This signal includes two poles and four mast arms and will eventually be replaced by a multilane roundabout currently scheduled for 2029, as a part of the Five-Year Plan.
More info: https://www.facebook.com/share/1H7NwbPUit/
Share Interim Signal Installation on Facebook
Share Interim Signal Installation on Twitter
Share Interim Signal Installation on Linkedin
Email Interim Signal Installation link
Thank you for your contribution!
Help us reach out to more people in the community
Share this with family and friends