March 21, 2024

  • Star Road is closed for the duration of the project.
  • Concrete work complete.
  • Placing waterproof membrane.
  • Backfilling both structures.
  • Placing Rip Rap.
  • Irrigation pipe remaining.
Share March 21, 2024 on Facebook Share March 21, 2024 on Twitter Share March 21, 2024 on Linkedin Email March 21, 2024 link

This project is substantially complete. 