April 11, 2025
- Contractor working on the east side of the intersection.
- Ped ramps and existing signal poles removed.
- RRFB poles placed, waiting on cure.
- Prepping for curb and sidewalk.
- Curb and gutter placed.
- Ped ramps placed.
- Forming for raised intersection.