April 4, 2025
- Contractor working on the east side of the intersection.
- Ped ramps and existing signal poles removed.
- RRFB poles placed, waiting on cure.
- Prepping for curb and sidewalk.
- Curb and gutter placed.
- Ped ramps ongoing.
- Storm drain manhole complete.
Share April 4, 2025 on Facebook
Share April 4, 2025 on X (formerly Twitter)
Share April 4, 2025 on Linkedin
Email April 4, 2025 link
This project is substantially complete.