  • Contractor working on the east side of the intersection.
  • Ped ramps and existing signal poles removed.
  • RRFB poles placed, waiting on cure.
  • Prepping for curb and sidewalk.
  • Curb and gutter placed.
  • Ped ramps ongoing.
  • Storm drain manhole complete.