Skip To

  • Skip to content

Page Outlines

Loading...

  • Documents
  • Fall 2021 Public Outreach
  • Project Designs

IE10 and below are not supported.

Google Chrome Mozilla Firefox

Contact us for any help on browser support

You are here:

  • Home
  • 2022 Pavement and Pedestrian Improvements

Documents

Fall 2021 Public Outreach

  • document icon Informational Slides (22.2 MB) (pdf)

Project Designs

  • document icon 9th St., Idaho St. to Bannock St. Design (440 KB) (pdf)
  • document icon 20th St., Lemp St. to Irene St. Design (942 KB) (pdf)
  • document icon Amity Rd., Enterprise St. to Production St. Design (577 KB) (pdf)
  • document icon Bluegrass Ave., Ellen's Ferry Dr. to Castle Dr. Design (653 KB) (pdf)
  • document icon Castle Hill Way, Castle Dr. to Drawbridge Dr. Design (740 KB) (pdf)
  • document icon Drawbridge Dr., West End to Castle Hill Way Design (634 KB) (pdf)
  • document icon Enterprise St., Amity Rd. to Commerce Ave. Design (562 KB) (pdf)
  • document icon Maple Grove Rd., I-84 Bridge to Franklin Rd. Design (647 KB) (pdf)
  • document icon Morris Hill Rd., west of Liberty St. to Hartman St. Design (435 KB) (pdf)
  • document icon Spaulding St., Phillippi St. to Orchard St. Design (536 KB) (pdf)
  • document icon Roosevelt St., Emerald St. to Irving St. Design (499 KB) (pdf)
  • document icon Turret Way, Drawbridge Dr. to Castle Dr. Design (694 KB) (pdf)