April 21, 2023
- 9th St., Idaho St. to Bannock St. - Complete.
- 20th St., Lemp St. to Irene St. - Reconstruct roadway; replace existing pedestrian ramps; replace damaged sidewalk
- Amity Rd., Enterprise St. to Production St. - Reconstruct roadway
- Bluegrass Ave., Ellen's Ferry Dr. to Castle Dr. - Waterline work by Veolia at Bluegrass and Elmer started April 17th. Bluegrass will be closed between Elmer and Castle Drive.
- Castle Hill Way, Castle Dr. to Drawbridge Dr. - Remove and replace pavement; install bulb-outs; replace existing pedestrian ramps; replace existing driveway approach
- Drawbridge Dr., West End to Castle Hill Way - Waterline work by Veolia is schedule to begin April 24th. Castel Hill Way will be closed during the work.
- Enterprise St., Amity Rd. to Commerce Ave. - Reconstruct roadway; replace existing pedestrian ramp
- Maple Grove Rd., I-84 Bridge to Franklin Rd. - Concrete work started April 5th. Lane restrictions will be in place for the duration of the work. Patching curb. Lane restrictions switching side on April 24th.
- Morris Hill Rd., west of Liberty St. to Hartman St. - Concrete work is ongoing. Pipe work complete. Patching trench.
- Roosevelt St., Emerald St. to Irving St. - Remove and replace pavement; install bulb-outs; replace existing pedestrian ramps; install new sidewalk to fill gaps; replace existing driveway approaches; rebuild existing speed humps
- Spaulding St., Phillippi St. to Orchard St. - Waterline replacement by Veolia started February 27th in advance of ACHD's project. Concrete work is complete. Pipe work is complete.
- Turret Way, Drawbridge Dr. to Castle Dr. - Reconstruct roadway; install bulb-outs; replace existing pedestrian ramps
Share April 21, 2023 on Facebook
Share April 21, 2023 on X (formerly Twitter)
Share April 21, 2023 on Linkedin
Email April 21, 2023 link
This project is substantially complete.