April 21, 2023

  • 9th St., Idaho St. to Bannock St. - Complete.
  • 20th St., Lemp St. to Irene St. - Reconstruct roadway; replace existing pedestrian ramps; replace damaged sidewalk
  • Amity Rd., Enterprise St. to Production St. - Reconstruct roadway
  • Bluegrass Ave., Ellen's Ferry Dr. to Castle Dr. - Waterline work by Veolia at Bluegrass and Elmer started April 17th. Bluegrass will be closed between Elmer and Castle Drive.
  • Castle Hill Way, Castle Dr. to Drawbridge Dr. - Remove and replace pavement; install bulb-outs; replace existing pedestrian ramps; replace existing driveway approach
  • Drawbridge Dr., West End to Castle Hill Way - Waterline work by Veolia is schedule to begin April 24th. Castel Hill Way will be closed during the work.
  • Enterprise St., Amity Rd. to Commerce Ave. - Reconstruct roadway; replace existing pedestrian ramp
  • Maple Grove Rd., I-84 Bridge to Franklin Rd. - Concrete work started April 5th. Lane restrictions will be in place for the duration of the work. Patching curb. Lane restrictions switching side on April 24th.
  • Morris Hill Rd., west of Liberty St. to Hartman St. - Concrete work is ongoing. Pipe work complete. Patching trench.
  • Roosevelt St., Emerald St. to Irving St. - Remove and replace pavement; install bulb-outs; replace existing pedestrian ramps; install new sidewalk to fill gaps; replace existing driveway approaches; rebuild existing speed humps
  • Spaulding St., Phillippi St. to Orchard St. - Waterline replacement by Veolia started February 27th in advance of ACHD's project. Concrete work is complete. Pipe work is complete.
  • Turret Way, Drawbridge Dr. to Castle Dr. - Reconstruct roadway; install bulb-outs; replace existing pedestrian ramps
Share April 21, 2023 on Facebook Share April 21, 2023 on Twitter Share April 21, 2023 on Linkedin Email April 21, 2023 link

This project is substantially complete. 