  • 20th Street, Lemp Street to Irene Street
    • Waterline work by Veolia started start June 12th. 20th Street will be closed during the work, which is expected to last two months. The segment from Heron i is complete. The segment between Ridenbaugh to Hazel is currently closed.
  • Bluegrass Avenue, Ellens Ferry Drive to Castle Drive
    • Complete.
  • Castle Hill Way, Castle Drive to Drawbridge Drive
    • Pipe work is complete. Concrete work on-going.
  • Turret Way, Drawbridge Drive to Castle Drive
    • Pipe work and storm drain work complete. Concrete work ongoing.
  • Morris Hill Road, west of Liberty Street to Hartman Street
    • Complete.
  • Spaulding Street, Philippi Street to Orchard Street
    • Complete.
  • Roosevelt Street, Emerald Street to Irving Street
    • Complete.
  • Maple Grove Road, I-84 Overpass to Franklin Road
    • Concrete work is complete.
  • Amity Road, Enterprise Street to Production Avenue
    • Roadway work started July 6th. Amity Road will be closed during the work, which is expected to last a month. Paving is expected July 24th.
  • Enterprise Street, Amity Road to Commerce Avenue
    • Concrete and pipe work are complete. Roadway work will begin after Amity is complete, anticipated for July 31st. Enterprise Street will be closed during the work, which is expected to last a month.
Share July 21, 2023 on Facebook Share July 21, 2023 on Twitter Share July 21, 2023 on Linkedin Email July 21, 2023 link

This project is substantially complete. 

<span class="translation_missing" title="translation missing: en-US.projects.blog_posts.show.load_comment_text">Load Comment Text</span>