May 19, 2023
- 9th St., Idaho St. to Bannock St. - Replace existing asphalt with concrete; install pedestrian bulb outs; replace existing pedestrian ramps; replace existing driveway approaches
- 20th St., Lemp St. to Irene St. - Reconstruct roadway; replace existing pedestrian ramps; replace damaged sidewalk
- Amity Rd., Enterprise St. to Production St. - Reconstruct roadway
- Bluegrass Ave., Ellen's Ferry Dr. to Castle Dr. - Pipework complete.
- Castle Hill Way, Castle Dr. to Drawbridge Dr. - Remove and replace pavement; install bulb-outs; replace existing pedestrian ramps; replace existing driveway approach
- Drawbridge Dr., West End to Castle Hill Way - Remove and replace pavement; install bulb-outs; replace existing pedestrian ramps
- Enterprise St., Amity Rd. to Commerce Ave. - Reconstruct roadway; replace existing pedestrian ramp
- Maple Grove Rd., I-84 Bridge to Franklin Rd. - Concrete work is complete. Roadway work is scheduled to begin late June. Maple Grove will be closed during the work which is anticipated to last a month.
- Morris Hill Rd., west of Liberty St. to Hartman St. - Concrete work is complete. Pipework is complete.
- Roosevelt St., Emerald St. to Irving St. - Concrete work started May 9th.
- Spaulding St., Phillippi St. to Orchard St. - Concrete work is complete. Pipework is complete. Roadway work started May 8th. Spaulding will be closed during the work - anticipated to last a month.
- Turret Way, Drawbridge Dr. to Castle Dr. - Waterline work by Veolia started May 4th. Turret Way will be closed during Veolia's work.
Share May 19, 2023 on Facebook
Share May 19, 2023 on X (formerly Twitter)
Share May 19, 2023 on Linkedin
Email May 19, 2023 link
This project is substantially complete.