May 19, 2023
- 9th St., Idaho St. to Bannock St. - Replace existing asphalt with concrete; install pedestrian bulb outs; replace existing pedestrian ramps; replace existing driveway approaches
- 20th St., Lemp St. to Irene St. - Reconstruct roadway; replace existing pedestrian ramps; replace damaged sidewalk
- Amity Rd., Enterprise St. to Production St. - Reconstruct roadway
- Bluegrass Ave., Ellen's Ferry Dr. to Castle Dr. - Pipework complete.
- Castle Hill Way, Castle Dr. to Drawbridge Dr. - Remove and replace pavement; install bulb-outs; replace existing pedestrian ramps; replace existing driveway approach
- Drawbridge Dr., West End to Castle Hill Way - Remove and replace pavement; install bulb-outs; replace existing pedestrian ramps
- Enterprise St., Amity Rd. to Commerce Ave. - Reconstruct roadway; replace existing pedestrian ramp
- Maple Grove Rd., I-84 Bridge to Franklin Rd. - Concrete work is complete. Roadway work is scheduled to begin late June. Maple Grove will be closed during the work which is anticipated to last a month.
- Morris Hill Rd., west of Liberty St. to Hartman St. - Concrete work is complete. Pipework is complete.
- Roosevelt St., Emerald St. to Irving St. - Concrete work started May 9th.
- Spaulding St., Phillippi St. to Orchard St. - Concrete work is complete. Pipework is complete. Roadway work started May 8th. Spaulding will be closed during the work - anticipated to last a month.
- Turret Way, Drawbridge Dr. to Castle Dr. - Waterline work by Veolia started May 4th. Turret Way will be closed during Veolia's work.
Share May 19, 2023 on Facebook
Share May 19, 2023 on Twitter
Share May 19, 2023 on Linkedin
Email May 19, 2023 link
This project is substantially complete.