Amity Road and Locust Grove Road Roundabout
Share Amity Road and Locust Grove Road Roundabout on Facebook
Share Amity Road and Locust Grove Road Roundabout on X (formerly Twitter)
Share Amity Road and Locust Grove Road Roundabout on Linkedin
Email Amity Road and Locust Grove Road Roundabout link
The Ada County Highway District is designing a future roundabout for the Amity and Locust Grove intersection. The purpose of the project is to improve traffic flow and increase safety for all users.
Project Description
- Construct a roundabout at the Amity and Locust Grove intersection.
- Amity Road legs will feature two lanes entering and exiting the roundabout.
- Locust Grove legs will feature one lane entering and exiting the roundabout.
- Include a truck apron for larger vehicles to use if necessary.
- Add street lighting.
- Construct stormwater basins.
- Add curb, gutter and buffered multi-use pathway.
- Include crosswalks at each leg of the intersection with two-stage pedestrian crossings.
- Install Rectangular Rapid Flashing Beacons at each pedestrian crossing to alert drivers to pedestrians.
- Construct a temporary asphalt pathway with a vertical element from the end of multi-use pathway to Mary McPherson Elementary School. The vertical element will be determined at a later date.
- Construction is planned for 2025.
Learn More About the Project
Please review the information below. While your comments are always welcome, the survey closed on February 21, 2023.
***********This project has been placed on a strategic hold. Please review the Integrated Five-Year Work Plan for any updates as to when design is expected to continue.**************
Page last updated: 16 Apr 2025, 03:59 PM