Amity Road and Locust Grove Road Roundabout

Share Amity Road and Locust Grove Road Roundabout on Facebook Share Amity Road and Locust Grove Road Roundabout on Twitter Share Amity Road and Locust Grove Road Roundabout on Linkedin Email Amity Road and Locust Grove Road Roundabout link

The Ada County Highway District is designing a future roundabout for the Amity and Locust Grove intersection. The purpose of the project is to improve traffic flow and increase safety for all users.

Project Description

  • Construct a roundabout at the Amity and Locust Grove intersection.
    • Amity Road legs will feature two lanes entering and exiting the roundabout.
    • Locust Grove legs will feature one lane entering and exiting the roundabout.
  • Include a truck apron for larger vehicles to use if necessary.
  • Add street lighting.
  • Construct stormwater basins.
  • Add curb, gutter and buffered multi-use pathway.
  • Include crosswalks at each leg of the intersection with two-stage pedestrian crossings.
  • Install Rectangular Rapid Flashing Beacons at each pedestrian crossing to alert drivers to pedestrians.
  • Construct a temporary asphalt pathway with a vertical element from the end of multi-use pathway to Mary McPherson Elementary School. The vertical element will be determined at a later date.
  • Construction is planned for 2025.

Learn More About the Project

Please review the information below. While your comments are always welcome, the survey closed on February 21, 2023.


***********This project has been placed on a strategic hold. Please review the Integrated Five-Year Work Plan for any updates as to when design is expected to continue.**************

The Ada County Highway District is designing a future roundabout for the Amity and Locust Grove intersection. The purpose of the project is to improve traffic flow and increase safety for all users.

Project Description

  • Construct a roundabout at the Amity and Locust Grove intersection.
    • Amity Road legs will feature two lanes entering and exiting the roundabout.
    • Locust Grove legs will feature one lane entering and exiting the roundabout.
  • Include a truck apron for larger vehicles to use if necessary.
  • Add street lighting.
  • Construct stormwater basins.
  • Add curb, gutter and buffered multi-use pathway.
  • Include crosswalks at each leg of the intersection with two-stage pedestrian crossings.
  • Install Rectangular Rapid Flashing Beacons at each pedestrian crossing to alert drivers to pedestrians.
  • Construct a temporary asphalt pathway with a vertical element from the end of multi-use pathway to Mary McPherson Elementary School. The vertical element will be determined at a later date.
  • Construction is planned for 2025.

Learn More About the Project

Please review the information below. While your comments are always welcome, the survey closed on February 21, 2023.


***********This project has been placed on a strategic hold. Please review the Integrated Five-Year Work Plan for any updates as to when design is expected to continue.**************

  • July 16, 2024

    Share July 16, 2024 on Facebook Share July 16, 2024 on Twitter Share July 16, 2024 on Linkedin Email July 16, 2024 link

    This project has been placed on a strategic hold. Please check back to our Integrated Five-Year Work Plan for any updates as to when design is expected to continue.

  • September 26, 2023

    Share September 26, 2023 on Facebook Share September 26, 2023 on Twitter Share September 26, 2023 on Linkedin Email September 26, 2023 link

    This project is on hold per the request of the Commission. The ACHD Team will go back to the Commission in early 2024 for direction on how the project will proceed.