August 25, 2023

  • The existing sidewalk has been removed. Crews prepping grade for sidewalk replacement.
  • Concrete placements for curb, gutter and sidewalk began August 3rd and are ongoing through the end of the month.
  • Contractor is removing existing concrete pavement in the northbound lanes.