Eagle Road and Ranch Drive Enhanced Pedestrian Crossing

Share Eagle Road and Ranch Drive Enhanced Pedestrian Crossing on Facebook Share Eagle Road and Ranch Drive Enhanced Pedestrian Crossing on Twitter Share Eagle Road and Ranch Drive Enhanced Pedestrian Crossing on Linkedin Email Eagle Road and Ranch Drive Enhanced Pedestrian Crossing link

Project is substantially complete. 

The Ada County Highway District (ACHD) will begin construction on the Eagle Road and Ranch Drive Enhanced Pedestrian Crossing project as early as the beginning of June 2023. The project is scheduled for substantial completion in September of 2023.*

Project Description:

  • Install a Pedestrian Hybrid Beacon (PHB) across Eagle Road at Ranch Drive
  • Reconstruct adjacent pedestrian ramps to meet modern standards
  • Remove and replace the existing asphalt pavement and stormwater pipes on Eagle Road at the intersection

*Due to high demand for contractors, labor and supplies, construction schedules may change.


The Ada County Highway District (ACHD) will begin construction on the Eagle Road and Ranch Drive Enhanced Pedestrian Crossing project as early as the beginning of June 2023. The project is scheduled for substantial completion in September of 2023.*

Project Description:

  • Install a Pedestrian Hybrid Beacon (PHB) across Eagle Road at Ranch Drive
  • Reconstruct adjacent pedestrian ramps to meet modern standards
  • Remove and replace the existing asphalt pavement and stormwater pipes on Eagle Road at the intersection

*Due to high demand for contractors, labor and supplies, construction schedules may change.


Project is substantially complete. 

  • May 26, 2023

    Share May 26, 2023 on Facebook Share May 26, 2023 on Twitter Share May 26, 2023 on Linkedin Email May 26, 2023 link
    • Pre-construction meeting was held on May 24th.
    • Notice to proceed is scheduled for June 5th.
    • Eagle Road will be closed for a maximum of two weeks - anticipated to begin July 17th.
  • April 11, 2023

    Share April 11, 2023 on Facebook Share April 11, 2023 on Twitter Share April 11, 2023 on Linkedin Email April 11, 2023 link

    ACHD will begin construction on the Eagle Road and Ranch Drive Enhanced Pedestrian Crossing project as early as the beginning of June 2023. Lane and sidewalk closures with detours are expected. A 7-day advance notice will be given via message boards in the project area prior to any full road closures. Residents and property owners are encouraged to use alternate routes as much as possible to minimize any potential impacts to traffic flows during the construction.

    The work may include, but is not limited to, the following impacts: general construction noise, dust, equipment backup alarms, and ground vibration. Regular construction hours are planned between 6:00 am and 8:00 pm Monday through Friday. Expect daily lane closures throughout the duration of the project. During construction, a full closure of the intersection at Eagle Road and Ranch Drive will be necessary for approximately 14 days to reconstruct and pave the intersection. During this closure, please expect weekend work to take place between 7:00 am and 10 pm.