April 25, 2025

25 Apr 2025
  • Lake Hazel and Eagle Intersection closed.
  • Wall construction ongoing.
  • Conduits and pole foundations being placed.
  • Placing road base.
  • Sidewalk prep ongoing.
Share April 25, 2025 on Facebook Share April 25, 2025 on Twitter Share April 25, 2025 on Linkedin Email April 25, 2025 link
#<Object:0x0000000027ee5e40>