February 14, 2025

14 Feb 2025
  • Lake Hazel and Eagle Intersection closed.
  • Cut and fill ongoing at Lake Hazel Intersection.
  • Wall excavation ongoing.
  • Wall blocks ongoing.
  • City of Meridian water ongoing.
  • Storm drain ongoing.
  • Irrigation work started January 20th and is on-going.