February 20, 2025

20 Feb 2025
  • Lake Hazel and Eagle Intersection closed.
  • Cut and fill ongoing at Lake Hazel Intersection.
  • Wall excavation ongoing.
  • Wall blocks ongoing.
  • City of Meridian water ongoing.
  • Storm drain ongoing.
  • Irrigation work started January 20th and is on-going.
Share February 20, 2025 on Facebook Share February 20, 2025 on Twitter Share February 20, 2025 on Linkedin Email February 20, 2025 link
#<Object:0x00007fe7049602b0>