February 7, 2025
- Lake Hazel and Eagle Intersection closed.
- Cut and fill ongoing at Lake Hazel Intersection.
- Wall excavation ongoing.
- Wall blocks ongoing.
- City of Meridian water ongoing.
- Storm drain ongoing.
- Irrigation work started January 20th and is on-going.