June 6, 2025

06 Jun 2025
  • Lake Hazel and Eagle Intersection closed.
  • Wall installation ongoing.
  • Conduits and pole foundations being placed.
  • Placing road base.
  • Sidewalk being placed.
  • Concrete paving June 2nd and will be on-going through June 18th.