June 6, 2025
- Lake Hazel and Eagle Intersection closed.
- Wall installation ongoing.
- Conduits and pole foundations being placed.
- Placing road base.
- Sidewalk being placed.
- Concrete paving June 2nd and will be on-going through June 18th.