March 6, 2025

06 Mar 2025
  • Lake Hazel and Eagle intersection closed.
  • Cut and fill ongoing at Lake Hazel intersection.
  • Wall excavation ongoing.
  • Other irrigation work ongoing.
  • Electrical conduits being installed.