March 6, 2026

  • Eagle Road was opened to one lane in each direction on December 23rd.
  • Signal at Eagle and Lake Hazel was activated on January 28th.
  • Sidewalk and other minor work ongoing.
  • Landscaping ongoing.
Share March 6, 2026 on Facebook Share March 6, 2026 on Twitter Share March 6, 2026 on Linkedin Email March 6, 2026 link
<span class="translation_missing" title="translation missing: en-US.projects.blog_posts.show.load_comment_text">Load Comment Text</span>