• Skip to main content
  • Jump to navigation
  • Search

Page Outlines

Loading...

    IE10 and below are not supported.

    Google Chrome Mozilla Firefox

    Contact us for any help on browser support

    Eckert Road Bridge and Eckert/Boise Intersection

    You are here:

    • Home
    • Eckert Road Bridge and Intersection Project

    Documents

    • document icon ITD Re-open letter (13.3 MB) (pdf)
    • document icon ITD Critical Findings Notification (190 KB) (pdf)
    • document icon Eckert Road Feasibility Study - Field Condition Assessment January 2025.pdf (32.6 MB) (pdf)
    • document icon October 2022 Inspection by ITD Consultant (1.78 MB) (pdf)
    • document icon October 2020 Inspection by ITD Consultant - Resistivity Testing (1.74 MB) (pdf)
    • document icon November 2019 Inspection by ACHD Consultant - Resistivity Testing (5.69 MB) (pdf)
    • document icon Adopted Resolution (1.48 MB) (pdf)
    • document icon Letter of Support_City of Boise (577 KB) (pdf)