December 20, 2024

  • Floating Feather Road is closed.
  • Contractor setting up dewatering.
  • Removal of bridge started December 9th.
  • Excavating for bridge foorings.
Share December 20, 2024 on Facebook Share December 20, 2024 on Twitter Share December 20, 2024 on Linkedin Email December 20, 2024 link
<span class="translation_missing" title="translation missing: en-US.projects.blog_posts.show.load_comment_text">Load Comment Text</span>