January 17, 2025

17 Jan 2025
  • Floating Feather Road is closed.
  • Contractor setting up dewatering.
  • Excavating for bridge footings.
  • Star water line being relocated.
  • Prepping for footings starting January 20th.
Share January 17, 2025 on Facebook Share January 17, 2025 on Twitter Share January 17, 2025 on Linkedin Email January 17, 2025 link