January 3, 2025

03 Jan 2025
  • Floating Feather Road is closed.
  • Contractor setting up dewatering.
  • Removal of bridge started December 9th.
  • Excavating for bridge footings.
Share January 3, 2025 on Facebook Share January 3, 2025 on Twitter Share January 3, 2025 on Linkedin Email January 3, 2025 link
#<Object:0x0000000039de6ed8>