January 3, 2025

  • Floating Feather Road is closed.
  • Contractor setting up dewatering.
  • Removal of bridge started December 9th.
  • Excavating for bridge footings.
Share January 3, 2025 on Facebook Share January 3, 2025 on Twitter Share January 3, 2025 on Linkedin Email January 3, 2025 link
<span class="translation_missing" title="translation missing: en-US.projects.blog_posts.show.load_comment_text">Load Comment Text</span>