January 31, 2025

31 Jan 2025
  • Floating Feather Road is closed.
  • Contractor setting up dewatering.
  • Excavating for bridge footings.
  • Star water line being relocated.
  • Prepping for footings started January 20th.
  • Footings being placed Feb 3rd.