May 1, 2026

  • Substructure repairs are complete.
  • Deck work started March 16th.
  • Half the bridge will be done at a time.
  • The road will remain open to one lane with a temporary signal.
  • Traffic was swapped on April 9th and work began on the second half of the bridge.
Share May 1, 2026 on Facebook Share May 1, 2026 on X (formerly Twitter) Share May 1, 2026 on Linkedin Email May 1, 2026 link

This project is substantially complete

<span class="translation_missing" title="translation missing: en-US.projects.blog_posts.show.load_comment_text">Load Comment Text</span>