May 13, 2026

  • Substructure repairs are complete.
  • Deck work is complete. The roadway will open no later than May 15th, after concrete reaches minimum strength.
  • An epoxy overlay will be placed after the new concrete has cured for a minimum of 28 days.
Share May 13, 2026 on Facebook Share May 13, 2026 on Twitter Share May 13, 2026 on Linkedin Email May 13, 2026 link
<span class="translation_missing" title="translation missing: en-US.projects.blog_posts.show.load_comment_text">Load Comment Text</span>