  • Linder Rd. south side closure began June 12th.
  • Sidewalk ongoing.
  • Idaho Power relocating their utilities.
  • Placed pole foundations.
  • Placing curb and gutter south of Overland.
  • Anticipated paving September 4th.
  • Concrete medium after paving.