Linder Overpass and Roadway Project, Franklin to Overland

Share Linder Overpass and Roadway Project, Franklin to Overland on Facebook Share Linder Overpass and Roadway Project, Franklin to Overland on Twitter Share Linder Overpass and Roadway Project, Franklin to Overland on Linkedin Email Linder Overpass and Roadway Project, Franklin to Overland link

The Ada County Highway District (ACHD) is designing future improvements for Linder Road between Franklin Road and Overland Road.

The proposed design includes an overpass spanning Interstate 84 and widening Linder Road to include additional travel lanes and facilities for those that walk, bike and roll. The design also proposes extending Linder Road from Overland Road to the new overpass.

The Ada County Highway District (ACHD) is designing future improvements for Linder Road between Franklin Road and Overland Road.

The proposed design includes an overpass spanning Interstate 84 and widening Linder Road to include additional travel lanes and facilities for those that walk, bike and roll. The design also proposes extending Linder Road from Overland Road to the new overpass.

  • March 19, 2025

    Share March 19, 2025 on Facebook Share March 19, 2025 on Twitter Share March 19, 2025 on Linkedin Email March 19, 2025 link
    19 Mar 2025

    Idaho Materials and Construction is set to begin construction on Phase 1 of the Linder Rd, Overland Rd to Franklin Rd project on March 24th, 2025.

    Construction is scheduled to be finished by late September 2025.

    This phase of the project consists of constructing the new north leg of the Overland Rd and Linder Rd Intersection, a large retaining wall for the new north leg, updating the signals to change from a three way to a four way intersection, installing 10’ multi-use pathways to complete connectivity through the intersection, and adding bike ramps at the intersection to transition cyclists off of the road and onto the multi-use pathway. The south leg will be closed from just north of Spanish Sun Way to Overland Rd during the second half of the project. Detours will be provided, and temporary traffic calming measures will be implemented in adjacent neighborhoods to address cut-through traffic. Phase 2 of the project, which includes the new overpass and road widening on Linder Rd from I-84 to Franklin Rd, is scheduled to begin in the summer of 2026.

  • Phase 1 construction to start in March 2025

    Share Phase 1 construction to start in March 2025 on Facebook Share Phase 1 construction to start in March 2025 on Twitter Share Phase 1 construction to start in March 2025 on Linkedin Email Phase 1 construction to start in March 2025 link
    13 Feb 2025

    The Ada County Highway District (ACHD) is starting Phase 1 of the Linder Road Overpass and Roadway Project as early as mid-March 2025*. Work is expected to be complete in Fall 2025.

    Work will include:

    • Reconstructing the Overland Road and Linder Road intersection, adding sidewalk, bulb-outs and a multi-use pathway.
    • Extending Linder Road north of Overland to I-84 to prepare for phase 2 when the overpass will be constructed.
    • Constructing an access road to future stormwater basin.

    What to expect:

    • Lane Restrictions: Both roads may have a reduced number of travel lanes occasionally, but flaggers will be present.
    • Intersection closures: The intersection may be temporarily closed at times to safely facilitate construction and/or utility work.
    • Pedestrians and Bike Route Detours: Detours will be in place to keep pedestrians and bicyclists moving safely.
    • Construction Activity: Expect general construction noise, including equipment backup alarms, dust and ground vibration.
    • Business Access: Access to businesses will stay open, and the contractor will work with property and business owners to keep entrances clear or provide alternate accesses.

    Phase 2, the overpass and work north of I-84, is expected to start mid-2026.

    *Schedule subject to change.

  • Construction to be split into two phases

    Share Construction to be split into two phases on Facebook Share Construction to be split into two phases on Twitter Share Construction to be split into two phases on Linkedin Email Construction to be split into two phases link
    27 Jun 2024

    The City of Meridian was recently awarded over $4 million in state transportation funding for this project. To utilize the funding, ACHD is splitting construction of the project into two phases. This phased approach aims to reduce overall duration and minimize impacts to the adjacent neighborhoods, most notably north of I-84.

    The first phase will focus on constructing improvements at the Overland Rd and Linder Rd intersection and a portion of the new roadway that will extend from Overland Rd to I-84. Please note this work does not include the overpass structure or any road widening north of I-84. Construction for Phase 1 is currently planned to begin in early 2025.

    The second phase of construction is currently programmed to begin late 2026 through 2027. This phase includes the I-84 overpass and the widening of Linder Rd from I-84 to Franklin Rd.

    As we approach construction there will be additional notifications and updates.To stay informed subscribe to project updates!

  • Fall 2023 Public Outreach

    Share Fall 2023 Public Outreach on Facebook Share Fall 2023 Public Outreach on Twitter Share Fall 2023 Public Outreach on Linkedin Email Fall 2023 Public Outreach link
    18 Oct 2023

    Please review the information below to learn more about the project. While your comments are always welcome, the survey closed November 2, 2023. Please note that the pdfs may take a moment to fully load.

  • March 16-30, 2023 Public Outreach

    Share March 16-30, 2023 Public Outreach on Facebook Share March 16-30, 2023 Public Outreach on Twitter Share March 16-30, 2023 Public Outreach on Linkedin Email March 16-30, 2023 Public Outreach link
    15 Mar 2023

    Please review the information below to learn more about the project. While your comments are always welcome, the comment period closed on March 30, 2023.


    Please note that while we are currently designing the proposed overpass and roadway, the involved agencies have not fully funded this project for construction or the purchase of needed property.