Share December 1, 2023 on Facebook
Share December 1, 2023 on X (formerly Twitter)
Share December 1, 2023 on Linkedin
Email December 1, 2023 link
- Mallard was paved on November 21st.
- Rail has been installed.
- Minor work remains, including landscaping and pavement markings.
- Mallard was paved on November 21st.
- Rail has been installed.
- Minor work remains, including landscaping and pavement markings.
This project is substantially complete.
-
Share November 22, 2023 on Facebook
Share November 22, 2023 on X (formerly Twitter)
Share November 22, 2023 on Linkedin
Email November 22, 2023 link
Mallard is closed for the duration of the project.
- Mallard paved November 21st.
- Landscaping and rail remaining.
Mallard is closed for the duration of the project.
- Mallard paved November 21st.
- Landscaping and rail remaining.
This project is substantially complete.
-
Share November 17, 2023 on Facebook
Share November 17, 2023 on X (formerly Twitter)
Share November 17, 2023 on Linkedin
Email November 17, 2023 link
► Mallard is closed for the duration of the project.
► Topping slab placed
► Sidewalk curb being placed
► Asphalt paving anticipated Nov 20th
► Mallard is closed for the duration of the project.
► Topping slab placed
► Sidewalk curb being placed
► Asphalt paving anticipated Nov 20th
This project is substantially complete.
-
Share November 9, 2023 on Facebook
Share November 9, 2023 on X (formerly Twitter)
Share November 9, 2023 on Linkedin
Email November 9, 2023 link
- Sidewalk and asphalt being removed and replaced.
- Prepping deck for topping slab.
- Rip rap placed, out of the creek.
- Sidewalk and asphalt being removed and replaced.
- Prepping deck for topping slab.
- Rip rap placed, out of the creek.
This project is substantially complete.
-
Share November 3, 2023 on Facebook
Share November 3, 2023 on X (formerly Twitter)
Share November 3, 2023 on Linkedin
Email November 3, 2023 link
- Dewatering ongoing.
- Backfilling ongoing.
- Rip rap placement after backfill.
- Sidewalk and asphalt being removed.
- Dewatering ongoing.
- Backfilling ongoing.
- Rip rap placement after backfill.
- Sidewalk and asphalt being removed.
This project is substantially complete.
-
Share October 27, 2023 on Facebook
Share October 27, 2023 on X (formerly Twitter)
Share October 27, 2023 on Linkedin
Email October 27, 2023 link
- Dewatering ongoing
- Backfilling ongoing
- Rip rap placement after backfill
- Dewatering ongoing
- Backfilling ongoing
- Rip rap placement after backfill
This project is substantially complete.
-
Share October 20, 2023 on Facebook
Share October 20, 2023 on X (formerly Twitter)
Share October 20, 2023 on Linkedin
Email October 20, 2023 link
- Footings placed.
- Dewatering ongoing.
- Precast boxes set.
- Closure pour anticipated October 17th.
- Backfill after closure pour is cured.
- Footings placed.
- Dewatering ongoing.
- Precast boxes set.
- Closure pour anticipated October 17th.
- Backfill after closure pour is cured.
This project is substantially complete.
-
Share October 12, 2023 on Facebook
Share October 12, 2023 on X (formerly Twitter)
Share October 12, 2023 on Linkedin
Email October 12, 2023 link
- Footings placed
- Dewatering ongoing
- Precast boxes set
- Closure pour anticipated on October 13th
- Backfill after closure pour is cleared
- Footings placed
- Dewatering ongoing
- Precast boxes set
- Closure pour anticipated on October 13th
- Backfill after closure pour is cleared
This project is substantially complete.
-
Share October 6, 2023 on Facebook
Share October 6, 2023 on X (formerly Twitter)
Share October 6, 2023 on Linkedin
Email October 6, 2023 link
- Footings placed.
- Dewatering ongoing.
- Placing Rip Rap.
- Anticipated box placement week of October 9th.
- Footings placed.
- Dewatering ongoing.
- Placing Rip Rap.
- Anticipated box placement week of October 9th.
This project is substantially complete.
-
Share September 29, 2023 on Facebook
Share September 29, 2023 on X (formerly Twitter)
Share September 29, 2023 on Linkedin
Email September 29, 2023 link
- Footings placed.
- Dewatering ongoing.
- Footings placed.
- Dewatering ongoing.
This project is substantially complete.