In early 2022 ACHD sought feedback on proposed alternatives for Maple Grove Road from Amity to Victory.


Preliminary alternatives considered widening Maple Grove Road to include:

  • 3-lane (one lane in each direction with a center turn lane), OR
  • 5-lane (two lanes in each direction with a center turn lane), OR
  • 4-lane (two lanes in each direction with a continuous center median and roundabouts at key intersections)


All alternatives featured:

  • Separated bicycle and pedestrian pathways on both sides with improved crossings at key intersections
  • A roundabout at the Maple Grove Road/Amity Road intersection
  • New wider bridges over the Knudsen Lateral and Tenmile Feeder canals


Below is the information that was shared with the public. The survey closed on March 10, 2022.