April 16, 2026

  • Munger Road closed during the project.
  • Speed bumps and speed trailer have been installed in the adjacent neighborhoods.
  • Munger Road - Base placed. Prepping for curb & sidewalk.
  • South Bridge #1005 complete.
  • Bridge #2001 complete.
Share April 16, 2026 on Facebook Share April 16, 2026 on Twitter Share April 16, 2026 on Linkedin Email April 16, 2026 link
<span class="translation_missing" title="translation missing: en-US.projects.blog_posts.show.load_comment_text">Load Comment Text</span>