April 2, 2026
- Munger Road closed during bridge replacement.
- Speed bumps have been installed in the adjacent neighborhoods.
- Speed trailer added.
- Munger Road - Excavating for road base.
- South Bridge - precast placed. Backfilled.
- Installing Bridge #2001 - Backfilling. Removing dewatering set up. Replacing irrigation pipe.