February 19, 2026

  • Munger Road closed during bridge replacement.
  • Speed bumps have been installed in the adjacent neighborhoods.
  • Speed trailer added.
  • Dewatering measures installed.
  • South bridge removed.
  • South Bridge precast placed. Forming footings and wingwalls.
  • Installing Bridge #2001. Excavated. Placing precast week of the February 23rd.