February 27, 2026

  • Munger Road closed during bridge replacement.
  • Speed bumps have been installed in the adjacent neighborhoods.
  • Speed trailer added.
  • Dewatering measures installed.
  • South bridge removed.
  • South Bridge precast placed.
  • Forming footings and wingwalls.
  • Installing Bridge #2001 - Excavated. Placing precast week of the February 23rd.
Share February 27, 2026 on Facebook Share February 27, 2026 on Twitter Share February 27, 2026 on Linkedin Email February 27, 2026 link
<span class="translation_missing" title="translation missing: en-US.projects.blog_posts.show.load_comment_text">Load Comment Text</span>