January 30, 2026

  • Munger Road closed during bridge replacement.
  • Speed bumps have been installed in the adjacent neighborhoods.
  • Dewatering measures installed.
  • South bridge removed.
  • Prepping for bridge placement.
  • Installing Bridge #2001 mid February.
  • Starting sewer work February 2nd.