March 13, 2026
- Munger Road closed during bridge replacement.
- Speed bumps have been installed in the adjacent neighborhoods.
- Speed trailer added.
- Dewatering measures installed.
- South Bridge precast placed. Backfilling and placing riprap.
- Installing Bridge #2001. Excavated. Precast installed. Grouting and forming for closure pour.
Share March 13, 2026 on Facebook
Share March 13, 2026 on Twitter
Share March 13, 2026 on Linkedin
Email March 13, 2026 link
Thank you for your contribution!
Help us reach out to more people in the community
Share this with family and friends