March 26, 2026

  • Speed bumps have been installed in the adjacent neighborhoods.
  • Speed trailer added.
  • Dewatering measures installed.
  • Munger Road - Excavating for road base.
  • South Bridge precast placed. Backfilled.
  • Installing Bridge #2001 - Backfilling. Removing dewatering set up.
Share March 26, 2026 on Facebook Share March 26, 2026 on Twitter Share March 26, 2026 on Linkedin Email March 26, 2026 link

This project is substantially complete