March 26, 2026
- Speed bumps have been installed in the adjacent neighborhoods.
- Speed trailer added.
- Dewatering measures installed.
- Munger Road - Excavating for road base.
- South Bridge precast placed. Backfilled.
- Installing Bridge #2001 - Backfilling. Removing dewatering set up.
Share March 26, 2026 on Facebook
Share March 26, 2026 on X (formerly Twitter)
Share March 26, 2026 on Linkedin
Email March 26, 2026 link
This project is substantially complete