March 6, 2026
- Munger Road closed during bridge replacement.
- Speed bumps have been installed in the adjacent neighborhoods.
- Speed trailer added.
- Dewatering measures installed.
- South Bridge precast placed.
- Forming and placing aprons.
- Installing Bridge #2001. Excavated. Precast installed. Grouting and forming for closure pour.