- Munger Road closed during the project.
- Speed bumps and speed trailer have been installed in the adjacent neighborhoods.
- Munger Road - Sidewalk and curb being placed. Asphalt paving is scheduled for May 11th.
- South Bridge #1005 complete.
- Bridge #2001 complete.