The final design for the Phillippi Street | Malad Street Project is complete. We made a few updates based on technical review and feedback from neighbors.

What changed

  • Adding bicycle push buttons at the Phillippi and Overland intersection, and Malad and Orchard intersection.
  • Adding permeable pavers to the on-street parking areas to help manage stormwater.
  • Phillippi St, Cassia St to Anna St
    • Will include 5 foot sidewalks on the west and 5-6 foot sidewalks on the east instead of 7-foot sidewalks on both sides.
    • Adding on-street parking on the west side between Cassia St and Grover St.
    • During the public outreach we learned that on-street parking was important to neighbors. This change makes room for on-street parking on one side of the street while minimizing impacts to irrigation facilities, vegetation and landscaping.
  • Phillippi St, Franklin Rd to Emerald St will have 5 foot sidewalk on both sides of the street instead of a mix of 5 and 10 foot sidewalk. This approach helps minimize impacts to commercial driveway access and better accommodates larger turning movements for commercial vehicles. It also provides a more consistent corridor design while better accommodating drainage.

View the updated designs under "Final Design Updates 2026".

Next Steps

Construction is currently scheduled to start in Fall 2029. In order to better coordinate with the significant utility relocations construction will be broken up into phases and spread out over a few years, wrapping up in 2033. However, this is a preliminary schedule that we will refine as we get closer to construction.