April 2, 2026

  • Black Cat remains closed south of Ustick Rd.
  • City of Meridian sewer and water line installation is complete.
  • Water Control Vault commissioning work is ongoing.
  • Underground electrical work and signal pole bases are complete.
  • Electrical contractor is working on the wiring in the signal cabinets.
  • Final remaining sections of concrete median islands, curb and gutter/sidewalk, along the eastern portion of Ustick, are complete.
  • Concrete sidewalk placements on South Black Cat are complete.
  • Concrete pavement on the south leg of Black Cat is ongoing.